![]() |
Pattern Corrections for Norah Gaughan, vol. 3, first edition |
![]() |
Pattern Corrections for Norah Gaughan, vol.3 first editionCorrections shown in Bold Eastlake, page 15 17 - SSK, p6, k7, p6, k1TBL, yo, k2, yo, k1TBL, p6, k7, p6, k2 tog. Front, page 16
Eastlake Scarf, page 17 With size 7 straight needles, cast on 52 sts. Strawberry Hill, page 18
Assemblage, page 19 & 20 note: due to the nature of this pat, the number of sts will vary from row to row. 1 (ws) – p2, (k1, yo, k1) all in next st, p1, * p1, k1, p2, (k1, yo, k1) all in next st, p1, rep from * to last 4 sts, end p1, k1, p2. 2 – k2, p1,k1, * p5, k1, p1, k1, rep from * to last 6 sts, end p5, k1. 3 – p2, p3 tog, p1, * p1, k1, p2, p3 tog, p1, * rep from * to last 4 sts, end p1, k1, p2. 4 – k3, LT2, * k1, RT2, k1, LT2, rep from * to last 3 sts, end k3. 5 – p2, k1, p1, * p1, (k1, yo, k1) all in next st, p2, k1, p1, rep from * to last 4 sts, end p1, (k1, yo, k1) all in next st, end p2. 6 – k1, p5, * k1, p1, k1, p5, rep from * to last 4 sts, end k1, p1, k2. 7 – p2, k1, p1, * p1, p3 tog, p2, k1, p1, rep from * to last 6 sts, end p1, p3 tog, p2. 8 – k3, RT2, * k1, LT2, k1, RT2, rep from * to last 3 sts, end k3. Rep these 8 rows for Pat St
Peterhof, page 21
Loppem, page 22 & 23 Sleeves Next row (ws) – work 37(38-42-45-49-53) sts, cast on 58(58-63-68-72-77) sts for left sleeve, p62(64-70-78-84-90), cast on 58(58-63-68-72-77) sts for right sleeve, place marker, work 37(38-42-45-49-53) sts – 252(256-280-304-326-350) sts. Working sts cast on for sleeves in Reverse st st and all other sts in pat as established, work even for 2 rows, end on ws. Keeping 21 sts at each front edge in cable pat as established and all other sts in st st, work even for 2 rows, end on ws. Dec row 1 (rs) – work 21 sts in cable pat, k14(10-13-8-17-5), k2 tog, * k10(10-8-7-6-6), k2 tog, rep from * 14(15-20-26-30-36) times more, k14(10-13-9-17-5), work to end – 236(239-258-276-294-312) sts. Work even in pat as established for 5 rows, end on ws. Dec row 2 (rs) – work 21 sts in cable pat, k13(9-12-7-16-4), k2 tog, * k9(9-7-6-5-5), k2 tog, rep from * 14(15-20-26-30-36) times more, k14(10-13-9-17-5), work to end – 220(222-236-248-262-274) sts. Work even for 5 rows, end on ws. Dec row 3 (rs) – work 21 sts in cable pat, k13(9-1-7-16-4), k2 tog, * k8(8-7-5-4-4), k2 tog, rep from * 14(15-20-26-30-36) times more, k13(9-2-8-16-4), work to end – 204(205-214-220-230-236) sts. Work even for 5 rows, end on ws. Dec row 4 – work 21 sts in cable pat, k12(8-1-10-15-3), k2 tog, * k7(7-6-4-3-3), k2 tog, rep from * 14(15-19-25-30-36) times more, k13(9-1-10-16-4), work to end – 188(188-194-194-198-198) sts. Work even until sleeves measure 5(5-5½-5½-6-6)” above cast-on edge, end on ws. Yoke Row 1 (rs) – p21, decreasing 4 sts across, drop marker, p to last 21 sts, decreasing 25 sts across, drop marker, p 21, decreasing 4 sts across – 155(155-161-161-165-165) sts. Next row (ws) – knit.
Calvert, page 24
Linear, page 26 right front Work to correspond to left front, reversing all shaping. Work short rows on ws rows, purling instead of knitting. When working wrapped sts, p each wrapped st and its wrap tog. Work side decs at end of rs rows as ssk, k3. Work neck decs at beg of rs rows as k3, ssk. Shape armhole same as right armhole on back. Disc, page 28 finished measurements circumference – 25” hat With circular needle, cast on 132 sts. Join, being careful not to twist sts. Mark for beg of rnd and carry marker up. Work even in pat st for 5½”, end on Rnd 2. Dec rnd – *k2tog, rep from * around – 66 sts. Beg with Rnd 2, work even in pat st until piece measures 7” from beg, end on Rnd 2. Rep dec rnd once more – 33 sts. Beg with rnd 2, work even in pat st until piece measures 8” from beg, end on Rnd 2. Next rnd: * k2 tog, rep from * around, end k1 – 17 sts. Rep the last rnd once more – 9 sts. Break off yarn leaving a long end for sewing. Thread end into tapestry needle and draw through all sts on needle. Pull up tightly and secure. Edging: With dpn’s, cast on 4 sts and work I-Cord as follows: row 1 (rs) - * k4, do not turn work. Slide sts to beg of needle to work next row from rs. Rep from * until cord reaches around lower edge of hat and to fit your head. Fasten off. Sew ends of I-Cord tog. Sew around lower edge of hat.
—posted 3/25/10
Cubic, page 30
Chisel, page 33 & 34 back With smaller straight needles, cast on 78(90-102-114-126- 138) sts. Ribbing: 1 (rs) – k2, * p2, k2, rep from * across. 2 – p2, * k2, p2, rep from * across. Rep these 2 rows until piece measures 3½” from beg, end on ws. Change to larger straight needles. Inc row (rs) - work 3(0-7-4-0-8) sts in ribbing as established, place marker, k to last 3(0-7-4-0-8) sts, increasing 41(45-47-51-53-57) sts across, place marker, work in ribbing as established to end – 119(135-149-165- 179-195) sts. Establish chart: Row 1 (ws) – work in ribbing as established to first marker, work row 1 of chart to next marker, work in ribbing as established to end.
sleeves With smaller straight needles, cast on 54 sts. Work in ribbing same as back for 3½”, end on ws. Change to larger straight needles. Inc row (rs): work 0(0-3-7-0-3) sts in ribbing as established, place marker, k to last 0(0-3-7-0- 3) sts, increasing 37(37-43-51-59-65) sts, place marker, work in ribbing as established to end – 91(91-97-105- 113-119) sts. Establish chart: row 1 (ws) – work in ribbing as established to first marker, work row 1 of chart to last marker, work in ribbing as established to end. —posted 2/6/09
|